D O B B S

Engineered by



The following are our Top 100 Projects over 30 years of engineering practice (the # is random of no significance just being used as a counter with the Alphameric sort):
  1. Abrams M1A1 Tank
  2. Aftermarket Repair
  3. Air Cycle Machines (ACM)
  4. Air Force Plant No. 3 Building Closeout
  5. Anechoic Chamber
  6. Assembly Operations
  7. Audit support (Coordinate Findings / Compliance Approval)
  8. Auxiliary Power Unit (APU)
  9. Automation
  10. Avtron K838AT Electric Power Automatic Tester
  11. B727
  12. B737NG
  13. Best Practices
  14. Bi-Static Measurement System
  15. CATIA Workstations
  16. Carrier Cooling Load HVAC Program
  17. Coordinate Measurement Machine (CMM)
  18. Cowl Door Drainage Tests
  19. Data Collection / Databases
  20. DC Quad Generator Test Stand
  21. Delays & Cancellations Study
  22. Design of Experiment (DOE)
  23. Document Control / Technical Publications
  24. Electric Power
  25. Engine Build-Up (EBU)
  26. Engine Condition Trend-Monitoring (ECTM)
  27. Engineering (General)
  28. Environmental Protection Agency (EPA) Compliance
  29. Enterprise Resource Planning (ERP)
  30. Executive Leadership
  31. Exterior Surface Coating (ESC) Automated Line
  32. F100
  33. Facilities Engineering
  34. Federal Aviation Administration (FAA) Approval
  35. Fin-Making Machines
  36. First-Pass-Yield (FPY) Improvement
  37. Fuel Heaters
  38. G500 / G600 (Gulfstream Aircraft Certs)
  39. Gas Turbine Engines
  40. Gear Rotary Actuator (GRA)
  41. Generators (AC/DC)
  42. Growth Initiatives
  43. Hardee's Remodel
  44. Heat Exchanger (HX)
  45. Health-Safety-Environmental (HSE)
  46. High Opportunity Areas (HOA) Training (India / Thailand)
  47. Industrial Gas Turbines
  48. Inspection Expert (IE)
  49. Integrated Drive Generator (IDG)
  50. JPATS Trainer
  51. Lean Manufacturing
  52. Linear Actuators
  53. Line Replaceable Unit (LRU)
  54. Maintenance (Facilities)
  55. Maintenance, Repair & Overhaul (MRO)
  56. MD80
  57. Mechanical Engineering
  58. MX Missile
  59. Merger / Acquisition / Buyouts
  60. Nacelles
  61. New Capabilities (New Capes)
  62. Oil Coolers
  63. Oil Tanks
  64. Original Equipment Manufacturer (OEM)
  65. Paint Processing / Surface Preparation / Surface Finish
  66. Parts Manufacturing Approval (PMA)
  67. Personnel Additions
  68. Power-By-The-Hour (PBTH)
  69. Pizza Hut Remodel
  70. Pneumatic Facility Expansion for ACM
  71. Process Improvement
  72. Profit Optimization
  73. Progressive Cavity Pumps (PCP)
  74. Quality Management System Upgrades
  75. RTCA DO-160 Testing
  76. Radar Absorbing Structure / Radar Absorbing Material (RAS / RAM)
  77. Ram Air Turbine (RAT)
  78. Recore for Heat Exchangers
  79. Repair Development Engineering (RDE)
  80. Reverse Engineering
  81. Shop Travelers (Standardization within ERP Master Parts lists)
  82. Sikorsky Presidential Helicopter Generator
  83. Six Sigma
  84. SOLIDWORKS
  85. Source Inspectors (Work with Customer to prevent)
  86. Spirit Business Plan Top 25% Award
  87. Supervisor Control and Data Acquisition (SCADA)
  88. Space Shuttle Payload Bay Doors
  89. Test Cells (New Build & Upgrades)
  90. Thrust Reversers (TR)
  91. Tooling
  92. Training
  93. Vacuum Braze Furnace
  94. Value Stream Mapping
  95. Visual Work Instructions (VWI)
  96. Wal-Mart Design / Build
  97. Well Casing
  98. Well Logging
  99. Well Perforation 
  100. X-Y Spray Robot